Compensation events are always difficult to get agreed (or as the contract calls it – implemented). This guidance document offers very practical advice on how to overcome issues that otherwise may arise to get these signed off.
A useful free guide from the NEC to help choose which NEC3 contract you should be using in a given situation.
A list of the 12 months worth of NEC3 discussions held within the LinkedIn group to the period leading up to May 2015.
A list of the 12 months worth of NEC3 discussions held within the LinkedIn group to the period leading up to May 2014.
Project start up check list for anyone embarking on an NEC3 contract.
One of the break out sessions at this years conference was hosted by Richard Patterson and Barry Trebes. Attached is the ouput from that session […]
Download: NEC newsletter 61 Programme article Which programme do you use to assess compensation events? This is a common problem that occurs on projects and […]
ECS High Level Quick User Guide This simple guide lists out the key sections and clauses of the ECS contract and shows readers where particular […]
Early Warning process map The early warning process is a very simple system but one that is often misunderstood and mismanaged by on or other […]
The acceleration provisions are actually very simple under the contract and are the mechanism for bringing forward the Completion Date at the request of the […]
This clause requires that all subsequent programmes include actual progress achieved on each operation and effect upon remaining work, , how Contractor plans to deal […]
The Accepted Programme is key in agreeing the true state of play at any one point in time for that project. The regularly submitted programmes […]
ECC Clause 31.2 is indeed one of the longest in the whole Contract, which provides a comprehensive list of what should be included within each […]
Clause 31.1 confirms that a programme can either be bound into the contract or a first programme issued for acceptance after contract award within the […]
The NEC suite of contracts puts far greater contractual requirements upon the Contractor to produce and manage a detailed programme than other forms of contract currently in existence within the construction industry. Clear contractual mechanisms for agreeing change between the parties are key to successs.
The early warning process is a mechanism for both parties to identify potential problems to the project. The contract emphasises that both Parties are obliged […]
Flow of communication is essential between the parties to ensure the level of understanding and transparency between the Parties. In particular clauses 13.1 and 13.7 […]
ECC Clause 11.2 – Defined Terms: There are a number of defined terms that are spread through out the NEC contract that have specific implications and useful to understand when producing and maintaining the contract programme.
The opening clause of the ECC contract brings two very important issues to the fore, that 1) everyone named and involved with the contract has to do what it says, and 2) do this in a spirit of mutual trust and cooperation.