title: Compensation Events - Good Practice Guide
date: 2013-07-16T07:59:03Z
modified: 2024-03-01T09:49:26Z
permalink: "https://gmhplanning.co.uk/nec-downloads/compensation-events-good-practice-guide/"
type: downloads
status: publish
excerpt: ""
wpid: 737
nec_contract_type:
  - NEC3
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
  - NEC Engineering & Construction Subcontract (ECS)
download_category:
  - Compensation events
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2022/01/NEC3-and-NEC4-Downloads.png"
featured_image_alt: ECSS
author: Glenn Hide
timestamp: 2024-03-01T09:49:26Z
tags:
  - NEC3
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - NEC Engineering & Construction Subcontract (ECS)
  - Compensation events
---

_One of the break out sessions at this years conference was hosted by Richard Patterson and Barry Trebes. Attached is the ouput from that session that was generated from the attendees to the conference. It forms an excellent guide as to some key things to consider by both Parties when managing change on a project._

[ECC Compensation Event Management – Good Practice – LinkedIn Conference 2013](http://gmhplanning.co.uk/wp-content/uploads/2013/07/ECC-Compensation-Event-Management-Good-Practice-LinkedIn-Conference-2013.pdf)

## Topics

**NEC Contract Editions:** [NEC3](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec3.md), [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md), [NEC Engineering & Construction Subcontract (ECS)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-subcontract.md)

**Download Categories:** [Compensation events](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/compensation-events.md)