Upcoming online instructor-led NEC4 public training workshops.
The online NEC4 Compensation Event training workshop introduces the NEC compensation event process, which is the mechanism within the NEC4 contracts for dealing with change.
The NEC4 ECC overview training workshop is a one‐day online NEC4 training course which introduces you to the new contracts within the NEC4 suite and the specific changes introduced to the NEC4 Engineering and Construction Contract (ECC).
The NEC4 Programme Workshop online training course introduces you to the key aspects of producing and managing a programme during the life of a project.