title: Which programme to use when assessing compensation events
date: 2013-01-21T13:35:22Z
modified: 2024-09-17T21:20:23Z
permalink: "https://gmhplanning.co.uk/nec-downloads/which-programme-to-use-when-assessing-compensation-events/"
type: downloads
status: publish
excerpt: ""
wpid: 1618
nec_contract_type:
  - NEC3
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
  - NEC Engineering & Construction Subcontract (ECS)
download_category:
  - Compensation events
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2022/01/NEC3-and-NEC4-Downloads.png"
featured_image_alt: ECSS
author: Glenn Hide
timestamp: 2024-09-17T21:20:23Z
tags:
  - NEC3
  - NEC Engineering & Construction Contract (ECC)
  - NEC Engineering & Construction Subcontract (ECS)
  - Compensation events
---

**Download:** [NEC newsletter 61 Programme article](http://gmhplanning.co.uk/assessing-compensation-events-which-programme-should-you-use/nec-newsletter-61-programme-article-2/)

Which programme do you use to [assess compensation events](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/guidance/ecc-section-63-assessing-compensation-events.md)? This is a common problem that occurs on projects and is an area that either the contract or the guidance notes could be more definitive in terms of how this should be carried out. This article that was published in edition 61 of the NEC3 User Group newsletter will explore some of the common misconceptions within the industry and how I believe change should be assessed particularly when the last [Accepted Programme](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/guidance/ecc-clause-31-3-programme-acceptance.md) is some months old…

Looking for NEC Training? Check out our[ new NEC Compensation Events & NEC Programme Training Courses.](/nec-training-courses/)

## Topics

**NEC Contract Editions:** [NEC3](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec3.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md), [NEC Engineering & Construction Subcontract (ECS)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-subcontract.md)

**Download Categories:** [Compensation events](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/compensation-events.md)