Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

CECA Rates for Equipment – CECA Bulletin 60

NEC contracts include the potential for having agreed rates for equipment included within a contract. These rates will be used in the agreement of costs […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC Supply Contract – CECA Bulletin 45

The NEC family include contracts for a variety of different contractual arrangements that could be necessary on a project. The previous bulletin (no 44) looked […]

NEC4 Engineering and Construction Contract

NEC4 ECC – Detailed review of changes from NEC3

Review by GMH Planning of the significant changes within the NEC4 ECC contract compared to that of the NEC3 version. We have not identified every […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Common Misconceptions Associated when Administering NEC Contracts – CECA Bulletin 35

There are some common misconceptions held by individuals or even whole project teams that wrongly assume how a particular clause or process should be understood […]

NEC4 Engineering and Construction Contract Short Contract ECSC

NEC4 ECSS Contract Data

Please find attached a downloadable and editable version of the NEC4 Engineering and Construction Short Subcontract (ECSS) contract data that can be used in compiling […]

NEC4 Engineering and Construction Contract Short Contract ECSC

NEC4 ECSC Contract Data

Please find attached a downloadable and editable version of the NEC4 Engineering and Construction Short Contract (ECSC) contract data that can be used in compiling […]

NEC4 Engineering and Construction Subcontract

NEC4 ECS Contract Data

Please find attached a downloadable and editable version of the NEC4 Engineering and Construction Subcontract (ECS) contract data that can be used in compiling your […]

NEC4 Engineering and Construction Contract

NEC4 ECC Contract Data

Please find attached a downloadable and editable version of the NEC4 Engineering and Construction Contract (ECC) contract data that can be used in compiling your […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 CECA Bulletin No 12: Use of cloud-based systems to manage NEC contracts

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 CECA Bulletin No 11: Contract Data parts 1 & 2

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC […]

NEC 4 Professional Services Contract PSC

NEC4 PSC- Detailed review of NEC4 Professional Services contract changes compared to NEC3

Here is the GMH Planning detailed guide as to the most important changes within the new NEC4 version of the Professional Services Contract. For those […]

NEC4 Engineering and Construction Contract Short Contract ECSC

NEC4 ECSC – Detailed review of NEC4 Engineering and Construction Short Contract changes from NEC3

Here is the GMH Planning detailed guide as to the most important changes within the new NEC4 version of Engineering and Construction Short Contract. If […]

LinkedIn NEC Contract Discussion Group GMH Planning - NEC Contract Experts

LinkedIn NEC People Discussions – June 2016-May 2017

Here is a hyperlinked list of all of the discussions held within the group between June 2016 and May 2017. Linked In Discussion Archive Jun […]

NEC4 Contracts Pack

NEC3 vs NEC4 – NEC4 Changes

Summary of NEC3 vs NEC4 changes and the NEC4 overview guide from Thomas Telford highlighting the main changes with the NEC4 family of contracts. NEC3 […]

ECSS

Archived LinkedIn group discussions:2013-June 2014

A list of the 12 months worth of NEC3 discussions held within the LinkedIn group to the period leading up to May 2014.

ECSS

Contract Data and Schedule of Cost Components Survey

Survey results from questions on NEC3 ECC schedule of cost components and contract Data.