Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Z clauses that could significantly alter risk profile – CECA Bulletin 38

Although the NEC Contract was meant in its base form to be applicable for all construction projects some Clients may still feel the need to […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Payments – CECA Bulletin 36

Section 5 is the main section of the contract that deals with payments and general commercial matters. Contractors need to make a sustainable margin on […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

CECA Bulletin 31 – Disallowed Costs

NEC Contract focus month 31 – Disallowed Costs Within options C, D,E & F of the NEC4 Engineering and Construction Contract (ECC), the Contractor is […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

CECA Bulletin 23 – Payment, Defined Cost and Schedule of Cost Components

NEC Contract focus month 23 – Payment, Defined Cost and Schedule of Cost Components Contractors need to ensure regular cashflow during a project and to […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

CECA Bulletin 22 – Project audits and contractual health checks

NEC Contract focus month 22 – Project audits and contractual health checks It is essential for any project team to be regularly reviewing and checking […]

10th conference

VIDEO: NEC People 2022 Conference

Catch up on the videos from our 2022 NEC People conference that was held at the Leonardo Hotel on the 14th June. It was a […]

NEC 4 Professional Services Contract PSC

NEC4 PSC- Detailed review of NEC4 Professional Services contract changes compared to NEC3

Here is the GMH Planning detailed guide as to the most important changes within the new NEC4 version of the Professional Services Contract. For those […]

NEC4 Engineering and Construction Contract

NEC4 ECC – Detailed review of NEC4 Engineering and Construction Contract changes from NEC3

Here is the GMH Planning detailed guide as to the most important changes within the new NEC4 version of Engineering and Construction Contract. If you […]

NEC4 Engineering and Construction Contract Short Contract ECSC

NEC4 ECSC – Detailed review of NEC4 Engineering and Construction Short Contract changes from NEC3

Here is the GMH Planning detailed guide as to the most important changes within the new NEC4 version of Engineering and Construction Short Contract. If […]

LinkedIn NEC Contract Discussion Group GMH Planning - NEC Contract Experts

LinkedIn NEC People Discussions – June 2016-May 2017

Here is a hyperlinked list of all of the discussions held within the group between June 2016 and May 2017. Linked In Discussion Archive Jun […]

NEC4 Contracts Pack

NEC3 vs NEC4 – NEC4 Changes

Summary of NEC3 vs NEC4 changes and the NEC4 overview guide from Thomas Telford highlighting the main changes with the NEC4 family of contracts. NEC3 […]

NEC People Logo

LinkedIn NEC People Discussions – June 2015-May 2016

A list of the 12 months worth of NEC3 discussions up of May 2016 within our LinkedIn group with direct links straight to each article.

ECSS

Archived LinkedIn group discussions:2013-June 2014

A list of the 12 months worth of NEC3 discussions held within the LinkedIn group to the period leading up to May 2014.

ECSS

Archive Discussions – LinkedIn Discussion Group

Linked In Discussion Archive A hyper-linked index of the useful discussions that have gone on within our LinkedIn discussion group – Planning and Management under […]

ECSS

LinkedIn Conference Output – Enhancements to NEC3

Potential Enhancements to NEC3 Following a session at the May 2011 LinkedIn conference, delegates suggested a number of matters that could be changed, added to […]

attero-rocketcaret-downclosefacebook-squarehamburgerinstagram-squarelinkedin-squarepauseplaytwitter-square