NEC4 CECA Bulletin No 9: Contractor Proposals and Whole Life Cost Savings

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC contracts that their members should take particular attention to. The ninth bulletin in our 2021 series is about the NEC4 processes for use of Contractor proposals (a.k.a. value engineering) and […]

    CECA GMH Planning NEC4 Bulletin

    CECA/GMH Bulletin 3 – ECC Secondary Options

    GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC contracts that their members should take particular attention to. The third bulletin is about choice of ECC Secondary Options under the contract and you can download a copy here: The […]

      CECA GMH Planning NEC4 Bulletin

      NEC4 CECA Bulletin no2 – Key Dates

      GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC contracts that their members should take particular attention to. The second bulletin is about Key Dates under the contract and you can download a copy here: The bulletins are meant […]

        NEC3 & NEC4 Guidance Notes & Free NEC Downloads, NEC Training and NEC Events by GMH Planning Ltd

        Adjudication and Dispute Avoidance Boards

        Here is a paper from the output of a break out group at our 2018 NEC People Conference written by Neil Earnshaw and Rob Horne. It considers the merits of adjudications, dispute avoidance boards and also the simple ways to try to avoid or limit disputes in the first place. BI NEC People – Conference […]

          NEC 4 Professional Services Contract PSC

          NEC4 PSC- Detailed review of NEC4 Professional Services contract changes compared to NEC3

          Here is the GMH Planning detailed guide as to the most important changes within the new NEC4 version of the Professional Services Contract. For those who are pretty familiar with the NEC3 version then you should find this document very useful to understand what the main changes are that have come about within NEC4. Each […]

            NEC4 Engineering and Construction Contract

            NEC4 ECC – Detailed review of NEC4 Engineering and Construction Contract changes from NEC3

            Here is the GMH Planning detailed guide as to the most important changes within the new NEC4 version of Engineering and Construction Contract. If you are fairly familiar with the NEC3 version then you will find this guide a very useful summary as to what you need to know is different within NEC4. Each of […]

              LinkedIn NEC Contract Discussion Group GMH Planning - NEC Contract Experts

              LinkedIn NEC People Discussions – June 2016-May 2017

              Here is a hyperlinked list of all of the discussions held within the group between June 2016 and May 2017. Linked In Discussion Archive Jun 16-May 17 Hope you find this useful.

                NEC4 Contracts Pack

                NEC4 Overview document

                Here is a link to the NEC4 Overview guide from Thomas Telford highlighting the main changes with the NEC4 family of contracts. I have then summarised this document into a one and a half page summary of the main headlines:

                  LinkedIn NEC People Discussions – June 2015-May 2016

                  A list of the 12 months worth of NEC3 discussions up of May 2016 within our LinkedIn group with direct links straight to each article.

                    Early Contractor Involvement

                    A useful free copy from NEC of the Early Contractor Involvement clauses.

                      Archived LinkedIn group discussions:2013-June 2014

                      A list of the 12 months worth of NEC3 discussions held within the LinkedIn group to the period leading up to May 2014.

                        Archive Discussions – LinkedIn Discussion Group

                        Linked In Discussion Archive A hyper-linked index of the useful discussions that have gone on within our LinkedIn discussion group – Planning and Management under the NEC form of contract.