---
title: Primary & secondary options
type: taxonomy_archive
taxonomy: download_category
slug: primary-secondary-options
term_id: 67
permalink: "https://gmhplanning.co.uk/download-category/primary-secondary-options/"
post_count: 20
---

# Primary & secondary options

Posts in this archive: 20

- [Amending/revising an Activity Schedule - CECA Bulletin 62](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-ecc-option-a-amending-revising-an-activity-schedule.md)
- [NEC4 ECC - Detailed review of changes from NEC3](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-ecc-detailed-review-changes-nec3.md)
- [X20 Key Performance Indicators (KPIs) - CECA Bulletin 41](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-x20-key-performance-indicators.md) — NEC X20 Key Performance Indicators (KPIs) allow a Client to create performance measurements to encourage a Contractor to act or perform in a certain way to help achieve wider Client objectives.
- [Secondary Option "Y" Clauses (Glenn Hide &amp; Barry Trebes) - CECA Bulletin 40](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-secondary-option-y-clauses.md)
- [Focus on Engineering and Construction Contract (ECC) options C & D - CECA Bulletin 28](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-ecc-option-c-and-option-d.md)
- [Focus on Engineering and Construction Contract (ECC) option B - CECA Bulletin 27](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-ecc-option-b-focus.md)
- [NEC4 X29 Climate Change](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-x29-climate-change.md)
- [Focus on Engineering and Construction Contract (ECC) option A - CECA Bulletin 26](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-ecc-option-a-focus.md)
- [Secondary Option X1: Price Adjustment for Inflation - CECA Bulletin 25](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/x1-price-adjustment-for-inflation.md)
- [VIDEO: NEC People 2022 Conference](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec-people-2022-conference-videos.md)
- [NEC4 CECA Bulletin No 9: Contractor Proposals and Whole Life Cost Savings](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-contractor-proposals-and-whole-life-cost-savings.md)
- [CECA/GMH Bulletin 3 - ECC Secondary Options](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-ecc-secondary-options.md)
- [Key Dates - NEC4 CECA Bulletin #2](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-ceca-bulletin-no2-key-dates.md)
- [Adjudication and Dispute Avoidance Boards](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/adjudication-and-dispute-avoidance-boards.md)
- [NEC4 PSC- Detailed review of NEC4 Professional Services contract changes compared to NEC3](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec4-detailed-review-changes-within-psc.md)
- [LinkedIn NEC People Discussions - June 2016-May 2017](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/linkedin-nec-people-discussions-june-2016-may-2017.md)
- [NEC3 vs NEC4 - NEC4 Changes](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/nec3-vs-nec4-nec4-changes-review.md)
- [Early Contractor Involvement](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/early-contractor-involvement.md) — A useful free copy from NEC of the Early Contractor Involvement clauses.
- [Archived LinkedIn group discussions:2013-June 2014](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/archived-linkedin-group-discussions2013-june-2014.md) — A list of the 12 months worth of NEC3 discussions held within the LinkedIn group to the period leading up to May 2014.
- [What do you price at tender stage - the Bill of Quantities or the Works Information?](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/downloads/price-tender-stage-bill-quantities-works-information.md) — An item that is included within the works information is clearly missing from the bill of quantities. How is this managed under an ECC form of contract?
