---
title: "NEC4 CECA Bulletin No 12: Use of cloud-based systems to manage NEC contracts"
date: 2021-12-02T16:20:56Z
modified: 2024-12-30T12:42:41Z
permalink: "https://gmhplanning.co.uk/nec-downloads/nec4-cloud-based-management-systems-for-managing-contracts/"
type: downloads
status: publish
excerpt: ""
wpid: 3042
nec_contract_type:
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - CECA Bulletins
  - Contract data
  - Contract types & documentation
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2024/02/GMH-CECA-NEC-Bulletin-Member-Briefing.jpg"
featured_image_alt: Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd
author: Glenn Hide
timestamp: 2024-12-30T12:42:41Z
tags:
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - CECA Bulletins
  - Contract data
  - Contract types & documentation
---

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC contracts that their members should take particular attention to.

The twelfth bulletin in our 2021 series is about using cloud-based systems to help manage the flow of communications on your cloud based projects, for which you can download a copy here:

[CECA NEC4 Bulletin No. 12 – Use of cloud-based systems to manage NEC contracts – December 2021](https://gmhplanning.co.uk/wp-content/uploads/2021/12/CECA-NEC4-Bulletin-No.-12-Use-of-cloud-based-systems-to-manage-NEC-contracts-December-2021.pdf)

The bulletin explores why these systems are so important and how they can bring efficiencies and clarity that a project needs. The bulletin also reminds that these systems would also be beneficial to use all the way down the supply chain as well, not just between Client/Contractor.

This series of bulletins are intended to be a quick focus on certain aspects of the contract to allow parties to properly price and programme accordingly at tender stage and manage the contractual processes during the life of the project.

## Topics

**NEC Contract Editions:** [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [CECA Bulletins](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/ceca-bulletins.md), [Contract data](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/contract-data.md), [Contract types & documentation](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/contract-types-documentation.md)