NECtar Podcast with Digital Beehive – episode 3: Why Construction Disputes Are Usually Avoidable

In Episode 003 of the NECtar Briefings, Lauren Flatt is joined by Glenn Hide (GMH Planning – NEC Training) and, this time, dispute resolution specialist […]

NEC4 Webinar – What does it actually mean to “act in a spirit of mutual trust and co-operation”?

In this webinar, Tim Leung, Sean Leung and Glenn Hide examined the NEC4 obligation to act in a spirit of mutual trust and co-operation through […]

NEC4 Webinar – What happens when a Project Manager does not respond?

Brad Cahill, Head of Commercial (Digital Beehive), opened the ‘NECtar sessions’ by asking attendees if their Project Managers always reply within agreed timescales. Interestingly, nearly […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 Webinar No.10 – Contractor’s proposals and X21 Whole Life Cost

The tenth webinar in this series is about Contractor’s proposals (value engineering) and X21 Whole Life Cost savings. Glenn Hide (GMH Planning), Ben Walker (Gather) […]

NECtar Podcast with Digital Beehive – episode 2: Poor communication could costs millions!

So many problems in construction projects can be traced back to communication. These can begin from unclear instructions, missed responses, record-keeping issues, and conversations not […]

Spirit of Mutual Trust and Co-operation: What does it really mean?

Here is an interesting article written by Sean and Tim Leung about the meaning of “spirit of mutual trust and co-operation” to get a deeper […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 Webinar No.9 – Disallowed costs (ECC options C/D/E)

The ninth webinar in this series is about understanding Disallowed Cost provisions under the cost reimbursable ECC options (C,D,E&F). Glenn Hide (GMH Planning), Ben Walker […]

NECtar Podcast with Digital Beehive – episode 1: ECC Option A

Managing NEC4 ECC Option A contracts: In Episode 1 of NECtar Briefings, Neil Earnshaw (NE Consult) and Glenn Hide (GMH Planning – NEC Training) break […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 Webinar No.8 – Understanding the Activity Schedule

The eighth webinar in this series is about understanding the role of the Activity Schedule under main options A and C. Glenn Hide (GMH Planning), […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 Webinar No.7 – Understanding Contract Data

The seventh webinar in this series is about understanding Contract Data. Glenn Hide (GMH Planning), Ben Walker (Gather) and David Allen (CECA) review all aspects […]

NEC4 Webinar – Project Audits & Contractual Health Checks (SE1EP3)

Here you can watch our webinar in conjunction with Digital Beehive where we discus “Project Audits & Contractual Health Checks”, along with introduce Lucy Hunt […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 Webinar No.6 – How to Approach Z Clauses/ Contract Amendments

The sixth webinar in this series all about Z clauses and contract amendments. Glenn Hide (GMH Planning), Ben Walker (Gather) and David Allen (CECA) review […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 Webinar No.5 – Programme: Getting it Right

The fifth webinar in this series all about planning and how to get the most out of your contract programme. Glenn Hide (GMH Planning), Ben […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 Webinar No.4 – Assessing Compensation Events (Cost)

The fourth webinar in this series is part 2 of our focus on assessing compensation events. Glenn Hide (GMH Planning), Ben Walker (Gather) and David […]

NEC4 Webinar – Managing Subcontractors (SE1EP2)

Here you can watch our webinar in conjunction with Digital Beehive where we discus “Closing the Gap: Subcontractor Management Under NEC Contracts”, along with introduce […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 Webinar No.3 – Assessing Compensation Events (Time)

The third webinar in this series is part 1 of our focus on assessing compensation events. Glenn Hide (GMH Planning), Ben Walker (Gather) and David […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 Webinar No.2 – Notifying Compensation Events and Instruction Quotations

This NEC4 Webinar focuses on the process of notifying compensation events and instruction quotations. Glenn Hide (GMH Planning), Ben Walker (Gather) and David Allen (CECA) review all aspects of this part of the compensation event process. The assessment process is covered in subsequent webinars.

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 Webinar 1- A Positive Approach to Early Warnings

The first webinar in this series focuses on how the early warning process should be understood and proactively managed for the benefit of all parties.

NEC People Logo

Survey: Use of cloud based systems with NEC contracts

Last year, we carried out a “state of the industry survey” around various issues currently faced of which the results are available on our GMH […]

uni of leeds logo

University of Leeds: Law and Contract Management (NEC4) Course

Just to share that shortly the Law and Contract Management course run by the University of Leeds is commencing, to which GMH Planning provide the […]

NEC People Logo

HIGHLIGHTS: NEC People Conference Scotland 2025

Really pleased to share the release of our highlights video from the 2025 NEC People Conference held in Glasgow, Scotland on 23rd September. It gives […]

attero-rocketcaret-downclosefacebook-squarehamburgerinstagram-squarelinkedin-squarepauseplaytwitter-square