Learn about the NEC Engineering & Construction Subcontract (ECS).
The NEC4 ECC overview training workshop is a one‐day online NEC4 training course which introduces you to the new contracts within the NEC4 suite and the specific changes introduced to the NEC4 Engineering and Construction Contract (ECC).
The NEC4 Programme Workshop online training course introduces you to the key aspects of producing and managing a programme during the life of a project.
Please find below a current list of the monthly CECA/GMH bulletins that have been issued to date, in order of most recently issued. CECA NEC4 […]
The Prices in NEC ECC contracts for main options A and C are the lump sum prices for each activity on the Activity Schedule, unless […]
The online NEC4 Compensation Event training workshop introduces the NEC compensation event process, which is the mechanism within the NEC4 contracts for dealing with change.
NEC contracts are written in a way to create clarity in terms of language and contractual processes. One such word NEC uses regularly throughout the […]
NEC contracts include the potential for having agreed rates for equipment included within a contract. These rates will be used in the agreement of costs […]
NEC contracts require regular flow of communications between the parties. They will typically be tracked by using one of the established cloud-based administration tools such […]
The NEC User Group has just published an article I have written on the use of Z clauses, which also includes highlighting some of the […]
NEC contracts require practical understanding as well as the resources, knowledge and culture to administer them for the maximum benefit of all parties on a […]
The NEC family of contracts continues to be a popular choice in UK infrastructure and construction sectors due to its collaborative and proactive management ethos. […]
The drive for a regular accepted programme on any project is a key feature of NEC contracts. A recently accepted programme will make it easier […]
Before parties enter into any contractual arrangement, it is important that they fully understand their rights, obligations, entitlements and liabilities. This bulletin will consider some […]
This bulletin considers a process that is rarely needed to be called upon on any project, but like any aspect of the contract it needs […]
Introduction This NEC4 Engineering and Construction Subcontract (ECSS) high-level overview is intended to be a quick reference guide as to where a particular subject matter […]
This bulletin considers how the pricing and payment mechanism is intended to work in the NEC4 Engineering and Construction Contract (ECC) with main Option B […]
Introduction This NEC4 Engineering and Construction Subcontract (ECS) high-level overview is intended to be a quick reference guide as to where a particular subject matter […]
For any project there will inevitably be numerous compensation events that will need to be agreed in terms of both cost and time. We have […]
The operation of an NEC contract, like any contract, benefits from robust record keeping. This is probably more pertinent with regards to NEC forms of […]
NEC contracts have always elevated the importance and contractual significance of a programme for any project. The first programme can either be produced at tender […]
Climate change is having visible effects on the world and is rarely out of the news with extreme temperatures, rainfall patterns changing and sea levels […]