NEC4 Engineering and Construction Contract

NEC4 ECC & ECSC – Detailed review of NEC4 Engineering and Construction Contract changes from NEC3

Review by GMH Planning of the significant changes within the NEC4 ECC & ECSC contract compared to that of the NEC3 version. We have not […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Top 10 Z Clauses That Could Significantly Alter Risk Profile – CECA Bulletin 38

Top 10 Z Clauses That Could Significantly Alter Risk Profile – CECA Bulletin 38 Although the NEC Contract was meant in its base form to […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Top Ten NEC4 ECC Clauses – CECA Bulletin 37

For many people trying to understand a contract can appear to be a bit daunting and even unnerving given some of the unfamiliar language that […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Engineering and Construction Short Contract (ECSC) – CECA Bulletin 32 – Engineering and Construction Short Contract (ECSC)

The most common contract used between the Client and Contractor for construction/building type works is the Engineering and Construction Contract (ECC). However, when a project […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Focus on Engineering and Construction Contract (ECC) options E & F – CECA Bulletin 29

The main contract between the Client and Contractor for general building/construction type projects is the Engineering and Construction Contract. It is subdivided into options, of […]

NEC4 Contracts Pack

NEC4 2023 Amendments

NEC have published some amendments to their family of NEC4 contracts and you can review/download the amendments here. For example, in the NEC4 ECC contract […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Project audits and contractual health checks – CECA Bulletin 22

NEC Contract focus month 22 – Project audits and contractual health checks It is essential for any project team to be regularly reviewing and checking […]

10th conference

VIDEO: NEC People 2022 Conference

Catch up on the videos from our 2022 NEC People conference that was held at the Leonardo Hotel on the 14th June. It was a […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

NEC4 CECA Bulletin No 12: Use of cloud-based systems to manage NEC contracts

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC […]

NEC3 & NEC4 Guidance Notes & Free NEC Downloads, NEC Training and NEC Events by GMH Planning Ltd

NEC4 2020 amendments

Here you can download the changes that have been introduced to the NEC4 contracts in 2020 to be read in conjunction with the previous versions […]

NEC3 & NEC4 Guidance Notes & Free NEC Downloads, NEC Training and NEC Events by GMH Planning Ltd

NEC 2019 amendments – download

NEC have issued a revision to their NEC4 contracts in 2019 to supercede the 2017 version. Whilst most of the amendments are simply typo’s or […]

NEC People Conference

VIDEO: NEC People Conference 2019

NEC People Conference 2019 Playlist: 01 – Introduction to conference – Matt Smith (K&L Gates) 02 – LinkedIn Group and Reachback, new 2019 NEC4 amendments […]

NEC People Conference

NEC People Conference 2020: Celebrating Success

We are pleased to announce that registration for this years London conference on the 16th June is now open. You can find the agenda by […]

NEC 4 Professional Services Contract PSC

NEC4 PSC- Detailed review of NEC4 Professional Services contract changes compared to NEC3

Here is the GMH Planning detailed guide as to the most important changes within the new NEC4 version of the Professional Services Contract. For those […]

LinkedIn NEC Contract Discussion Group GMH Planning - NEC Contract Experts

LinkedIn NEC People Discussions – June 2016-May 2017

Here is a hyperlinked list of all of the discussions held within the group between June 2016 and May 2017. Linked In Discussion Archive Jun […]

NEC4 Contracts Pack

NEC3 vs NEC4 – NEC4 Changes

Summary of NEC3 vs NEC4 changes and the NEC4 overview guide from Thomas Telford highlighting the main changes with the NEC4 family of contracts. NEC3 […]

ECSS

Archived LinkedIn group discussions:2013-June 2014

A list of the 12 months worth of NEC3 discussions held within the LinkedIn group to the period leading up to May 2014.

GMH Planning Ltd - NEC Contract Training Courses & NEC Consultancy

NEC Works Information Guidance Document

The NEC published in 2012 a free guidance document with regards to producing Works Information. It is a very useful document and available here to […]

attero-rocketcaret-downclosefacebook-squarehamburgerinstagram-squarelinkedin-squarepauseplaytwitter-square