NEC4 ECC Overview NEC Public Training Workshop - Online NEC Training

NEC4 ECC Overview – Remote NEC4 Training

The NEC4 ECC overview training workshop is a one‐day online NEC4 training course which introduces you to the new contracts within the NEC4 suite and the specific changes introduced to the NEC4 Engineering and Construction Contract (ECC).

  • Fri, Jan 8, 2027 +1 more Next training date
  • 9:15 am - 4:30 pm Event time
  • Online Event location
  • £ 195.00 Price per attendee
Image for NEC Training Course 3 NEC4 Programme Workshop by GMH Planning Ltd

NEC4 ECC Overview Training Course

This NEC4 overview training workshop is a one‐day course which introduces you to the new contracts and significant changes in NEC4 Engineering and Construction Contract (ECC).

  • 7 hours 15 mins Course duration
  • £195 – £1,825 Price
  • Classroom, Online Delivery mode
Image for NEC Training Course 1 NEC3 NEC4 Overview and Introduction to the ECC by GMH Planning Ltd

NEC3/NEC4 ECC Overview Training Course

This one-day NEC3/NEC4 Engineering Construction Contract (ECC) overview training course introduces the common philosophies and key mechanics and provisions of the ECC.

  • 7 hours 15 mins Course duration
  • £195 – £1,825 Price
  • Classroom, Online Delivery mode
Image for NEC Training Course 3 NEC4 Programme Workshop by GMH Planning Ltd

NEC3/NEC4 Programme Workshop Training Course

This one-day NEC3/NEC4 Programme workshop training session introduces you to the key aspects of producing and managing a programme during the life of a project.

  • 7 hours 15 mins Course duration
  • £195 – £1,825 Price
  • Classroom, Online Delivery mode
NEC Training Course 5 ECC Compensation Event Workshop by GMH Planning Ltd

NEC3/NEC4 ECC Compensation Event Workshop

This one-day training workshop introduces the ECC compensation event process which is the mechanism within the NEC3/NEC4 contracts for dealing with change.

  • 7 hours 15 mins Course duration
  • £195 – £1,825 Price
  • Classroom, Online Delivery mode
Image for NEC Training Course 4 NEC3 / NEC4 Bespoke Project Workshop by GMH Planning Ltd

NEC3/NEC4 Bespoke Project Workshop

This one-day NEC Bespoke Project workshop is intended for a particular project or scheme to promote a common understanding of the main elements of their NEC3/NEC4 contract.

  • 7 hours 15 mins Course duration
  • £2,175 – £2,375 Price
  • Classroom, Online Delivery mode
NEC Training Course 6 Applying ECC in Practice by GMH Planning Ltd

Applying ECC in Practice Training Workshop

This one-day training workshop on applying NEC3/NEC4 ECC in practice is a practical look at some of the more significant aspects of the Engineering and Construction Contract (ECC).

  • 7 hours 15 mins Course duration
  • £1,625 – £1,825 Price
  • Classroom, Online Delivery mode
NEC Training Course 8 Preparing and Pricing ECC Contract Documentsby GMH Planning Ltd

Preparing and Pricing ECC Contract Documents Training Workshop

This half-day workshop is a closer review of the tendering stage of a project. It will consider the key information and documents that go together to make up an NEC3 / NEC4 ECC contract. This will review the documents that the Employer puts into a Contractor’s tender, as well as the considerations that the Contractor should consider when they are preparing their tender return.

  • 4 hours Course duration
  • £812 – £912 Price
  • Classroom, Online Delivery mode
NEC Training Course 8 Understanding Risk within NEC3 / NEC4 Contracts by GMH Planning Ltd

Understanding Risk within NEC3/NEC4 Contracts Training Workshop

This half-day workshop on understanding risk within NEC3/NEC4 contracts considers both more traditional approaches to identifying and managing risk compared to the processes specifically identified within the NEC3 / NEC4 suite of contracts. It considers definition of risk and risk management before looking at the traditional risk registers that often get produced and reviewed generally across construction projects.

  • 4 hours Course duration
  • £812 – £912 Price
  • Classroom, Online Delivery mode
NEC Training Course 9: Producing Better Works Information by GMH Planning Ltd

Producing Better Works Information Training Workshop

Works Information requires a lot of consideration and attention to detail in the first place from the Employer, as this is the information that the Contractor will use to base their price upon. Errors, vagueness or ambiguity within Works Information will all lead to either increased tender costs or a larger number of compensation events that will require administration and assessment during the life of a project.

  • 7 hours 15 mins Course duration
  • £1,625 – £1,825 Price
  • Classroom, Online Delivery mode
NEC Training Course 10: Communications and the Role of Project Managerby GMH Planning Ltd

Communications and the Role of Project Manager Training Workshop

This half-day workshop considers in detail the pivotal role of the Project Manager within the NEC3/NEC4 ECC contract. The Project Manager is appointed by the Employer to administer the contract on their behalf and has a great deal of responsibility and actions to carry out.

  • 4 hours Course duration
  • £812 – £912 Price
  • Classroom, Online Delivery mode
NEC Training Course 11: NEC3 / NEC4 Overview and Introduction to the Engineering and Construction Subcontract (ECS) by GMH Planning Ltd

NEC3/NEC4 Engineering and Construction Subcontract (ECS) Overview

This one-day NEC ECS training workshop introduces you to the common philosophies of the NEC family of contracts and focuses in more detail upon the key mechanics and provisions of the NEC3 / NEC4 Engineering and Construction Subcontract (ECS). 

  • 7 hours 15 mins Course duration
  • £1,625 – £1,825 Price
  • Classroom, Online Delivery mode
NEC Training Course 12 NEC3 / NEC4 Overview and Introduction to the Professional Services Contract PSC by GMH Planning Ltd

NEC3/NEC4 Professional Services Contract (PSC) Overview

This one-day workshop introduces you to the common philosophies of the NEC family of contracts and focuses in more detail upon the key mechanics and provisions of the NEC3 / NEC4 Professional Services Contract (PSC).  This is the main contract that will be used to administer works between an Employer and a Consultant.

  • 7 hours 15 mins Course duration
  • £1,625 – £1,825 Price
  • Classroom, Online Delivery mode
NEC Training Course 13 NEC3 / NEC4 Overview and Introduction to the Term Service Contract (TSC) by GMH Planning Ltd

NEC3/NEC4 Term Service Contract (TSC) Overview

This one-day workshop introduces you to the common philosophies of the NEC family of contracts and focuses in more detail upon the key mechanics and provisions of the NEC3 / NEC4 Term Service Contract (TSC).  This is the main contract that will be used for a supplier to manage and provide a service for a prescribed period of time.

  • 7 hours 15 mins Course duration
  • £1,625 – £1,825 Price
  • Classroom, Online Delivery mode
NEC Training Course 14 NEC3 NEC4 Overview Introduction Engineering and Construction Short Contract ECSC

NEC3/NEC4 Engineering and Construction Short Contract (ECSC) Overview

Why you should attend this workshop? You will gain an understanding of the key processes both leading up to contract award and then how to […]

  • 7 hours 15 mins Course duration
  • £1,625 – £1,825 Price
  • Classroom, Online Delivery mode
NEC Training Course 15 NEC3 / NEC4 Overview and Introduction to the Supply Contract (SC)

NEC3/NEC4 Supply Contract (SC) Overview

This one-day training workshop introduces you to the common philosophies of the NEC family of contracts and focuses in more detail upon the key mechanics and provisions of the NEC3/NEC4 Supply Contract (SC).

  • 7 hours 15 mins Course duration
  • £1,626 – £1,825 Price
  • Classroom, Online Delivery mode
NEC4 Programme Workshop NEC Public Training Workshop - Online NEC Training

NEC4 Programme Workshop – Remote NEC Training

The NEC4 Programme Workshop online training course introduces you to the key aspects of producing and managing a programme during the life of a project.

  • Fri, Jan 22, 2027 +1 more Next training date
  • 9:15 am - 4:15 pm Event time
  • Online Event location
  • £ 195.00 Price per attendee
NEC4 Compensation Events Online NEC Public Training Workshop - Online Training

NEC4 Compensation Event Workshop – Remote NEC Training

The online NEC4 Compensation Event training workshop introduces the NEC compensation event process, which is the mechanism within the NEC4 contracts for dealing with change.

  • Fri, Feb 26, 2027 Next training date
  • 9:00 am - 4:15 pm Event time
  • Online Event location
  • £ 195.00 Price per attendee
attero-rocketcaret-downclosefacebook-squarehamburgerinstagram-squarelinkedin-squarepauseplaytwitter-square