---
title: Classroom
type: taxonomy_archive
taxonomy: mode
slug: classroom-in-house
term_id: 50
permalink: "https://gmhplanning.co.uk/mode/classroom-in-house/"
post_count: 15
description: "Classroom &amp; inhouse/onsite <a href=\"https://gmhplanning.co.uk/nec-training-courses/\">NEC contract training courses</a>."
---

# Classroom

Posts in this archive: 15

- [NEC4 ECC Overview Training Course](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-nec4-overview-workshop.md) — This NEC4 overview training workshop is a one‐day course which introduces you to the new contracts and significant changes in NEC4 Engineering and Construction Contract (ECC).
- [NEC3/NEC4 ECC Overview Training Course](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-nec3-nec4-overview-introduction-ecc-engineering-construction-contract.md) — This one-day NEC3/NEC4 Engineering Construction Contract (ECC) overview training course introduces the common philosophies and key mechanics and provisions of the ECC.
- [NEC3/NEC4 Programme Workshop Training Course](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-nec3-nec4-programme-workshop.md) — This one-day NEC3/NEC4 Programme workshop training session introduces you to the key aspects of producing and managing a programme during the life of a project.
- [NEC3/NEC4 Bespoke Project Workshop](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-nec3-bespoke-project-workshop.md) — This one-day NEC Bespoke Project workshop is intended for a particular project or scheme to promote a common understanding of the main elements of their NEC3/NEC4 contract.
- [NEC3/NEC4 ECC Compensation Event Workshop](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-ecc-compensation-event-workshop.md) — This one-day training workshop introduces the ECC compensation event process which is the mechanism within the NEC3/NEC4 contracts for dealing with change.
- [Applying ECC in Practice Training Workshop](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-applying-ecc-practice.md) — This one-day training workshop on applying NEC3/NEC4 ECC in practice is a practical look at some of the more significant aspects of the Engineering and Construction Contract (ECC).
- [Preparing and Pricing ECC Contract Documents Training Workshop](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-preparing-pricing-ecc-contract-documents.md) — This half-day workshop is a closer review of the tendering stage of a project. It will consider the key information and documents that go together to make up an NEC3 / NEC4 ECC contract. This will review the documents that the Employer puts into a Contractor’s tender, as well as the considerations that the Contractor should consider when they are preparing their tender return.
- [Understanding Risk within NEC3/NEC4 Contracts Training Workshop](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-understanding-risk-within-nec3-contracts.md) — This half-day workshop on understanding risk within NEC3/NEC4 contracts considers both more traditional approaches to identifying and managing risk compared to the processes specifically identified within the NEC3 / NEC4 suite of contracts. It considers definition of risk and risk management before looking at the traditional risk registers that often get produced and reviewed generally across construction projects.
- [Producing Better Works Information Training Workshop](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-producing-better-works-information.md) — Works Information requires a lot of consideration and attention to detail in the first place from the Employer, as this is the information that the Contractor will use to base their price upon. Errors, vagueness or ambiguity within Works Information will all lead to either increased tender costs or a larger number of compensation events that will require administration and assessment during the life of a project.
- [Communications and the Role of Project Manager Training Workshop](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-communications-role-project-manager.md) — This half-day workshop considers in detail the pivotal role of the Project Manager within the NEC3/NEC4 ECC contract. The Project Manager is appointed by the Employer to administer the contract on their behalf and has a great deal of responsibility and actions to carry out.
- [NEC3/NEC4 Engineering and Construction Subcontract (ECS) Overview](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-nec3-overview-introduction-engineering-construction-subcontract.md) — This one-day NEC ECS training workshop introduces you to the common philosophies of the NEC family of contracts and focuses in more detail upon the key mechanics and provisions of the NEC3 / NEC4 Engineering and Construction Subcontract (ECS). 
- [NEC3/NEC4 Professional Services Contract (PSC) Overview](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-nec-overview-introduction-professional-services-contract.md) — This one-day workshop introduces you to the common philosophies of the NEC family of contracts and focuses in more detail upon the key mechanics and provisions of the NEC3 / NEC4 Professional Services Contract (PSC).  This is the main contract that will be used to administer works between an Employer and a Consultant.
- [NEC3/NEC4 Term Service Contract (TSC) Overview](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-nec3-overview-introduction-term-service-contract.md) — This one-day workshop introduces you to the common philosophies of the NEC family of contracts and focuses in more detail upon the key mechanics and provisions of the NEC3 / NEC4 Term Service Contract (TSC).  This is the main contract that will be used for a supplier to manage and provide a service for a prescribed period of time.
- [NEC3/NEC4 Engineering and Construction Short Contract (ECSC) Overview](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-nec3-overview-introduction-engineering-construction-short-contract.md)
- [NEC3/NEC4 Supply Contract (SC) Overview](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/training-course-nec3-overview-introduction-supply-contract.md) — This one-day training workshop introduces you to the common philosophies of the NEC family of contracts and focuses in more detail upon the key mechanics and provisions of the NEC3/NEC4 Supply Contract (SC).
