NEC4 Training Courses
NEC Training Course 6 Applying ECC in Practice by GMH Planning Ltd

Applying ECC in Practice Training Workshop

This one-day training workshop on applying NEC3/NEC4 ECC in practice is a practical look at some of the more significant aspects of the Engineering and Construction Contract (ECC).

  • 7 hours 15 mins Course duration
  • £1,625 – £1,825 Price
  • Classroom, Online Delivery mode

Each of the contractual areas covered will consider what the specific aspects are for that element of the contract, before carrying out in small groups an associated practical exercise to enhance the level of understanding as to how it can be administered in practice.

Why you should attend this training workshop? 

Attendees of this applying ECC in practice training course will have a much clearer practical understanding of these specific processes and see how they should administer them for the benefit of all Parties on a particular project.

You will learn about:

  • the main parameters for choice of primary and secondary options
  • communication forms and consideration of what should be included
  • early warnings and the production/maintenance of the Risk Register
  • main programme requirements and what should go into a programme and an associated narrative with each submission
  • consideration as to which events do or do not constitute compensation events and the resultant process
  • assessing the Price for Work Done to Date (interim assessments) 

Recommended for:

The Applying ECC in Practice training workshop is recommended for everyone currently or about to be working under an ECC contract, including project managers, contract managers, quantity surveyors, clients, consultants, planners, contractors and their supply chain.  This session will be suitable for those who are relatively new to these forms of contract, as well as those who are already more experienced in the contract and looking to enhance their level of knowledge and understanding.

chevron_left
chevron_right
attero-rocketcaret-downclosefacebook-squarehamburgerinstagram-squarelinkedin-squarepauseplaytwitter-square