Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Ten Top Tips for Managing NEC Contracts Effectively – CECA Bulletin 58

NEC contracts require practical understanding as well as the resources, knowledge and culture to administer them for the maximum benefit of all parties on a […]

NEC4 Engineering and Construction Contract

NEC4 ECC – Detailed review of changes from NEC3

Review by GMH Planning of the significant changes within the NEC4 ECC contract compared to that of the NEC3 version. We have not identified every […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

State of the Industry Survey 2024 Results – CECA Bulletin 43

We have recently conducted a detailed survey within the industry to find out people’s experience of managing NEC contracts. The NEC family of contracts have […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Z Clauses That Could Significantly Alter Risk Profile – CECA Bulletin 38

Z Clauses That Could Significantly Alter Risk Profile – CECA Bulletin 38 Although the NEC Contract was meant in its base form to be applicable […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Payments – CECA Bulletin 36

Section 5 is the main section of the contract that deals with payments and general commercial matters. Contractors need to make a sustainable margin on […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Disallowed Costs – CECA Bulletin 31

NEC Contract focus month 31 – Disallowed Costs Within options C, D,E & F of the NEC4 Engineering and Construction Contract (ECC), the Contractor is […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Payment, Defined Cost and Schedule of Cost Components – CECA Bulletin 23

NEC Contract focus month 23 – Payment, Defined Cost and Schedule of Cost Components Contractors need to ensure regular cashflow during a project and to […]

Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd

Project audits and contractual health checks – CECA Bulletin 22

NEC Contract focus month 22 – Project audits and contractual health checks It is essential for any project team to be regularly reviewing and checking […]

10th conference

VIDEO: NEC People 2022 Conference

Catch up on the videos from our 2022 NEC People conference that was held at the Leonardo Hotel on the 14th June. It was a […]

NEC 4 Professional Services Contract PSC

NEC4 PSC- Detailed review of NEC4 Professional Services contract changes compared to NEC3

Here is the GMH Planning detailed guide as to the most important changes within the new NEC4 version of the Professional Services Contract. For those […]

NEC4 Engineering and Construction Contract Short Contract ECSC

NEC4 ECSC – Detailed review of NEC4 Engineering and Construction Short Contract changes from NEC3

Here is the GMH Planning detailed guide as to the most important changes within the new NEC4 version of Engineering and Construction Short Contract. If […]

LinkedIn NEC Contract Discussion Group GMH Planning - NEC Contract Experts

LinkedIn NEC People Discussions – June 2016-May 2017

Here is a hyperlinked list of all of the discussions held within the group between June 2016 and May 2017. Linked In Discussion Archive Jun […]

NEC4 Contracts Pack

NEC3 vs NEC4 – NEC4 Changes

Summary of NEC3 vs NEC4 changes and the NEC4 overview guide from Thomas Telford highlighting the main changes with the NEC4 family of contracts. NEC3 […]

ECSS

Archived LinkedIn group discussions:2013-June 2014

A list of the 12 months worth of NEC3 discussions held within the LinkedIn group to the period leading up to May 2014.

attero-rocketcaret-downclosefacebook-squarehamburgerinstagram-squarelinkedin-squarepauseplaytwitter-square