NEC Public Training Workshops
NEC4 ECC Overview NEC Public Training Workshop - Online NEC Training

NEC4 ECC Overview – Remote NEC4 Training (02nd March 2026)

  • Mon, Mar 2, 2026 Event date
  • 9:00 am - 4:15 pm Event time
  • Online Event location
  • £195 Price per attendee

The NEC4 ECC overview training workshop is a one‐day online NEC4 training course which introduces you to the new contracts within the NEC4 suite and the specific changes introduced to the NEC4 Engineering and Construction Contract (ECC).

The online NEC4 ECC overview training session runs remotely via MS Teams from 9am – 4.15pm. There are limited places to allow a good level of interactivity for all attendees. Sessions focus on the new NEC4 versions of the contract but also cover differences from NEC3 to NEC4 so still relevant for any one still engaged under NEC3 versions of the contract.

NEC4 is a welcome enhancement to what was already a very practical set of contracts, but like anything it needed to evolve to move with the times and address issues reported from the industry that were still common place.

This online NEC4 ECC overview training workshop will explore the significant changes that on a practical basis are the ones for regular users of the contract to understand. There are a number of key changes some of which are contract wide, and some of which are specific to individual contracts. The changes include in our NEC4 overview training course cover amendments to standard wording, additional clauses, additional secondary options and changes to guidance. The workshop will consider why it was felt they were needed and how they should be practically understood. For many organizations or projects already working to NEC3 on long term projects the migration across to NEC4 will take several months or even year(s). This workshop will therefore also consider/remind key virtues that people should understand with NEC contracts and consider common issues that are still happening on projects and how they can be avoided – with or without the new wording within NEC4.

Attendees of the online NEC4 EEC overview training workshop will have a much clearer understanding of the intent of the specific contractual clauses of the new NEC4 contracts and in practical terms begin to see how they should understood/administered for the benefit of all parties on a particular project.

You will learn about:

  • The new contracts added to the NEC4 suite of contracts.
  • Subtle principle changes across the NEC4 suite of contracts.
  • New secondary options in NEC4
  • Main changes in particular to the NEC4 ECC contract, why they were deemed necessary and how they can/will work in practice.
  • Common issues still occurring on projects working to NEC3 and how they could be overcome/avoided.

NEC4 ECC overview training workshop is recommended for:

The online NEC4 ECC overview training workshop is recommended for anyone currently involved with NEC3 contracts who wish to have a good understanding of the changes that NEC4 will bring on a practical basis, including project managers, contract managers, quantity surveyors, clients, consultants, planners, contractors and their supply chain.

Pricing

Each session cost £195+ VAT (with discounts for multiple bookings) and you will be sent course notes before hand for each training day.

Full agenda’s for each session are available upon request, just confirm your interest in booking a session(s) by filling in the booking request form.

We also run in-house/classroom based NEC training sessions in case you are looking for a dedicated training for your project team, rather than sharing a public session, so please look at our NEC3 & NEC4 contract training courses which can be tailored to your specific requirements.

Excellent
Excellent star rating
Trustpilot Logo
Trustpilot

Public NEC Training Workshop FAQs

Can anyone of any level of experience attend these workshops?

expand_less expand_more

Yes, these public NEC training sessions cater for anyone's level of experience if they are relatively new to NEC contracts or much more experienced. Everyone attending will broaden their knowledge and understanding.

How much do these public courses cost per person?

expand_less expand_more

A single workshop will cost £195(+vat) but anyone booking more than one person or more than one different workshop receives a 10% discount on all bookings.

Which workshops do you run publicly?

expand_less expand_more

Currently we offer our three most popular courses as scheduled public online NEC training sessions, which are our NEC4 ECC Overview Workshop, NEC4 Programme Workshop and NEC4 Compensation Event Workshop. Please see online NEC training workshops for schedules.

How often are public NEC training workshops run?

expand_less expand_more

You will normally be able to find an available online NEC training workshops within the two months of inquiry. Please see online NEC training workshops for upcoming schedules. We also offer standard onsite and online NEC training courses which and be booked on any date subject to instructor availability.

chevron_left
attero-rocketcaret-downclosefacebook-squarehamburgerinstagram-squarelinkedin-squarepauseplaytwitter-square