Learn about the New Engineering Contract edition 4 (NEC4).
Every two to three years, the NEC People LinkedIn group conducts a State of the Industry Survey to gather industry feedback on how effectively different […]
Several of our previous bulletins have covered various aspects of the compensation event process, including: This bulletin will focus specifically on the three quotation types […]
The NEC family include contracts for a variety of different contractual arrangements that could be necessary on a project. For example, the Professional Service Contract […]
Like any project under any form of contract, it is important to close it out efficiently and tie up any contractual loose ends. This bulletin […]
Please find below a current list of the monthly CECA/GMH bulletins that have been issued to date, in order of most recently issued. CECA NEC4 […]
Understanding the contractual requirements and starting off a project in accordance with the contractual rules will be integral to the success of a well-run and […]
Secondary option X22 allows a Client to choose “Early Contractor involvement” as an inclusion into an ECC contract. This creates a two-stage single contract with […]
The NEC form of contract is often described as a contract built on collaboration, communication, and proactive management. However, these are not outcomes guaranteed by […]
Scope is probably the most important contractual document which therefore needs careful consideration. This bulletin will explain why it is so important and will offer […]
The ‘dividing date’ is a new term introduced into NEC4 contracts. It is only referenced in three separate clauses. This bulletin will explore what the […]
The NEC4 ECC overview training workshop is a one‐day online NEC4 training course which introduces you to the new contracts within the NEC4 suite and the specific changes introduced to the NEC4 Engineering and Construction Contract (ECC).
The NEC4 Programme Workshop online training course introduces you to the key aspects of producing and managing a programme during the life of a project.
The Prices in NEC ECC contracts for main options A and C are the lump sum prices for each activity on the Activity Schedule, unless […]
The online NEC4 Compensation Event training workshop introduces the NEC compensation event process, which is the mechanism within the NEC4 contracts for dealing with change.
NEC contracts are written in a way to create clarity in terms of language and contractual processes. One such word NEC uses regularly throughout the […]
school NEC Training Course 1
This NEC4 overview training workshop is a one‐day course which introduces you to the new contracts and significant changes in NEC4 Engineering and Construction Contract (ECC).
school NEC Training Course 2
This one-day NEC3/NEC4 Engineering Construction Contract (ECC) overview training course introduces the common philosophies and key mechanics and provisions of the ECC.
NEC contracts include the potential for having agreed rates for equipment included within a contract. These rates will be used in the agreement of costs […]
NEC contracts require regular flow of communications between the parties. They will typically be tracked by using one of the established cloud-based administration tools such […]
The NEC User Group has just published an article I have written on the use of Z clauses, which also includes highlighting some of the […]
NEC contracts require practical understanding as well as the resources, knowledge and culture to administer them for the maximum benefit of all parties on a […]