---
title: Primary & secondary options
type: taxonomy_archive
taxonomy: event_category
slug: primary-secondary-options
term_id: 78
permalink: "https://gmhplanning.co.uk/event-category/primary-secondary-options/"
post_count: 1
---

# Primary & secondary options

Posts in this archive: 1

- [NEC4 ECC Overview - Remote NEC4 Training](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/event/nec4-ecc-overview-remote-nec4-training.md) — The NEC4 ECC overview training workshop is a one‐day online NEC4 training course which introduces you to the new contracts within the NEC4 suite and the specific changes introduced to the NEC4 Engineering and Construction Contract (ECC).
