---
title: NEC4 X29 Climate Change
date: 2023-02-01T13:36:14Z
modified: 2024-08-20T20:28:51Z
permalink: "https://gmhplanning.co.uk/nec-downloads/nec4-x29-climate-change/"
type: downloads
status: publish
excerpt: ""
wpid: 5161
nec_contract_type:
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
  - NEC Engineering & Construction Subcontract (ECS)
download_category:
  - Primary & secondary options
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2023/02/Climate-change.jpg"
featured_image_alt: Climate change
author: Glenn Hide
timestamp: 2024-08-20T20:28:51Z
tags:
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - NEC Engineering & Construction Subcontract (ECS)
  - Primary & secondary options
---

![Climate change](https://gmhplanning.co.uk/wp-content/uploads/2023/02/Climate-change-1024x525.jpg)

NEC have published a new secondary option X29 based around climate change. It is quite a detailed option and also comes with guidance notes to be considered when putting X29 together initially and then managing it on a live project. There is a different version of X29 for each of the contracts within the NEC family.

Here you can download a copy of the NEC4 ECC X29 clauses for your information.

If you wish any other versions of X29 for other contracts just drop us a message on our contact page and we will be happy to provide it.

[NEC4-X29-Climate-Change-ECC](https://gmhplanning.co.uk/wp-content/uploads/2023/02/NEC4-X29-Climate-Change-ECC.pdf)[Download](https://gmhplanning.co.uk/wp-content/uploads/2023/02/NEC4-X29-Climate-Change-ECC.pdf)

Here is a copy of the guidance notes that accompany the clauses

[NEC4-X29-Climate-Change-Guidance-Notes-ECC](https://gmhplanning.co.uk/wp-content/uploads/2023/02/NEC4-X29-Climate-Change-Guidance-Notes-ECC.pdf)[Download](https://gmhplanning.co.uk/wp-content/uploads/2023/02/NEC4-X29-Climate-Change-Guidance-Notes-ECC.pdf)

## Topics

**NEC Contract Editions:** [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md), [NEC Engineering & Construction Subcontract (ECS)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-subcontract.md)

**Download Categories:** [Primary & secondary options](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/primary-secondary-options.md)