title: Adjudication and Dispute Avoidance Boards
date: 2018-10-02T05:47:48Z
modified: 2024-03-01T09:49:14Z
permalink: "https://gmhplanning.co.uk/nec-downloads/adjudication-and-dispute-avoidance-boards/"
type: downloads
status: publish
excerpt: ""
wpid: 2511
nec_contract_type:
  - NEC3
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - Primary & secondary options
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2022/01/NEC-Contract-Training-Guidance-Events-Free-Downloads-by-GMH-Planning-New-Engineering-Contract-Specialists.jpg"
featured_image_alt: NEC3 & NEC4 Guidance Notes & Free NEC Downloads, NEC Training and NEC Events by GMH Planning Ltd
author: Glenn Hide
timestamp: 2024-03-01T09:49:14Z
tags:
  - NEC3
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - Primary & secondary options
---

Here is a paper from the output of a break out group at our 2018 NEC People Conference written by Neil Earnshaw and Rob Horne. It considers the merits of adjudications, dispute avoidance boards and also the simple ways to try to avoid or limit disputes in the first place.

[BI NEC People – Conference Paper – Methods of resolving disputes](https://gmhplanning.co.uk/wp-content/uploads/2018/10/BI-NEC-People-Conference-Paper-Methods-of-resolving-disputes.pdf)

[BI NEC People – Conference Paper – Methods of resolving disputes](https://gmhplanning.co.uk/wp-content/uploads/2018/10/BI-NEC-People-Conference-Paper-Methods-of-resolving-disputes.pdf)[Download](https://gmhplanning.co.uk/wp-content/uploads/2018/10/BI-NEC-People-Conference-Paper-Methods-of-resolving-disputes.pdf)

## Topics

**NEC Contract Editions:** [NEC3](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec3.md), [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [Primary & secondary options](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/primary-secondary-options.md)