title: NEC4 Practice Note 1 - Rules for assessing compensation events against an Accepted Programme
date: 2017-10-10T09:08:44Z
modified: 2024-03-01T09:49:14Z
permalink: "https://gmhplanning.co.uk/nec-downloads/nec4-practice-note-1-rules-assessing-compensation-events-accepted-programme/"
type: downloads
status: publish
excerpt: ""
wpid: 2129
nec_contract_type:
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - Compensation events
  - Programme
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2022/01/NEC4-Engineering-and-Construction-Contract.jpg"
featured_image_alt: NEC4 Engineering and Construction Contract
author: Glenn Hide
timestamp: 2024-03-01T09:49:14Z
tags:
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - Compensation events
  - Programme
---

Finally we have a guidance note as to how to assess compensation events against the last Accepted Programme and what should first be taken into account. It won’t always be easy, particularly when the last Accepted Programme is several months old but at least for the first time we have clear direction as to what the contract always intended. Here is a link to download the document:

[ECC4\_Practice Note 1 – final](https://gmhplanning.co.uk/wp-content/uploads/2017/10/ECC4_Practice-Note-1-final.pdf)

## Topics

**NEC Contract Editions:** [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [Compensation events](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/compensation-events.md), [Programme](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/programme.md)