title: CECA/GMH Bulletin 3 - ECC Secondary Options
date: 2021-03-04T17:42:27Z
modified: 2024-12-30T12:42:46Z
permalink: "https://gmhplanning.co.uk/nec-downloads/nec4-ecc-secondary-options/"
type: downloads
status: publish
excerpt: ""
wpid: 2914
nec_contract_type:
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - CECA Bulletins
  - Primary & secondary options
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2024/02/GMH-CECA-NEC-Bulletin-Member-Briefing.jpg"
featured_image_alt: Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd
author: Glenn Hide
timestamp: 2024-12-30T12:42:46Z
tags:
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - CECA Bulletins
  - Primary & secondary options
---

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC contracts that their members should take particular attention to.

The third bulletin is about choice of ECC Secondary Options under the contract and you can download a copy here:

[CECA NEC4 Bulletin No.3 – March 2021](https://gmhplanning.co.uk/wp-content/uploads/2021/03/CECA-NEC4-Bulletin-No.3-March-2021.pdf)[Download](https://gmhplanning.co.uk/wp-content/uploads/2021/03/CECA-NEC4-Bulletin-No.3-March-2021.pdf)

The bulletins are meant to be a quick focus on certain aspects of the contract and what they mean to allow a Contractor to properly price and programme accordingly at tender stage and during the life of the project.

## Topics

**NEC Contract Editions:** [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [CECA Bulletins](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/ceca-bulletins.md), [Primary & secondary options](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/primary-secondary-options.md)