title: NEC4 CECA Bulletin No4 – Compensation Event Quotations and use of Assumptions
date: 2021-03-31T14:58:33Z
modified: 2024-12-30T12:42:46Z
permalink: "https://gmhplanning.co.uk/nec-downloads/ecc-compensation-event-quotations/"
type: downloads
status: publish
excerpt: ""
wpid: 2923
nec_contract_type:
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - CECA Bulletins
  - Compensation events
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2024/02/GMH-CECA-NEC-Bulletin-Member-Briefing.jpg"
featured_image_alt: Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd
author: Glenn Hide
timestamp: 2024-12-30T12:42:46Z
tags:
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - CECA Bulletins
  - Compensation events
---

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC contracts that their members should take particular attention to.

The fourth bulletin is about pricing compensation event quotations and the use of assumptions, for which you can download a copy here:

[CECA NEC4 Bulletin No.4 – Pricing Compensation Events and The Use of Assumptions – April 2021](https://gmhplanning.co.uk/wp-content/uploads/2021/03/CECA-NEC4-Bulletin-No.4-Pricing-Compensation-Events-and-The-Use-of-Assumptions-April-2021.pdf)

The bulletins are meant to be a quick focus on certain aspects of the contract and what they mean to allow a Contractor to properly price and programme accordingly at tender stage and during the life of the project.

## Topics

**NEC Contract Editions:** [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [CECA Bulletins](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/ceca-bulletins.md), [Compensation events](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/compensation-events.md)