title: NEC4 CECA bulletin No 1 - Z clauses
date: 2021-01-28T09:12:13Z
modified: 2024-12-30T12:42:48Z
permalink: "https://gmhplanning.co.uk/nec-downloads/nec4-ceca-bulletin-no-1-z-clauses/"
type: downloads
status: publish
excerpt: ""
wpid: 2890
nec_contract_type:
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - CECA Bulletins
  - Compensation events
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2024/02/GMH-CECA-NEC-Bulletin-Member-Briefing.jpg"
featured_image_alt: Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd
author: Glenn Hide
timestamp: 2024-12-30T12:42:48Z
tags:
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - CECA Bulletins
  - Compensation events
---

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC contracts that their members should take particular attention to. This first bulletin is on Z clauses and you can download a copy here:

[CECA NEC4 Bulletin No.1 – Z clauses](https://gmhplanning.co.uk/wp-content/uploads/2021/01/CECA-NEC4-Bulletin-No.1-Z-clauses.pdf)[Download](https://gmhplanning.co.uk/wp-content/uploads/2021/01/CECA-NEC4-Bulletin-No.1-Z-clauses.pdf)

The bulletins are meant to be a quick focus on certain aspects of the contract and what they mean to allow a Contractor to properly price and programme accordingly at tender stage and during the life of the project.

## Topics

**NEC Contract Editions:** [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [CECA Bulletins](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/ceca-bulletins.md), [Compensation events](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/compensation-events.md)