Posts
NEC People Logo

Survey: Use of cloud based systems with NEC contracts

Last year, we carried out a “state of the industry survey” around various issues currently faced of which the results are available on our GMH Planning website (free downloads/bulletin no.43).

Here we are conducting a second (and very important) survey. Currently, there are several cloud-based systems out there being used on projects, most of which are either not 100% compliant with the contract and/or are not very user-friendly. It is also often the case that users have no choice in the system that has been imposed upon them.

To this end, if you have or are using a cloud-based system(s), please take the time to complete this survey to highlight any strengths/weaknesses around them. We can then provide feedback to the industry and providers, where they can all improve their systems and create better user experiences for everyone involved.

Link: surveymonkey.com/r/W72TLYF

Please also share the link with anyone else you work with who is using such systems. The more data from results that we get, the more we can help the industry as a whole and influence future developments.

chevron_left
chevron_right
attero-rocketcaret-downclosefacebook-squarehamburgerinstagram-squarelinkedin-squarepauseplaytwitter-square