title: "NEC4 CECA Bulletin No 8: Programmes with compensation event quotations"
date: 2021-07-30T14:34:31Z
modified: 2024-12-30T12:42:43Z
permalink: "https://gmhplanning.co.uk/nec-downloads/nec4-ceca-bulletin-no-8-programmes-with-compensation-event-quotations/"
type: downloads
status: publish
excerpt: ""
wpid: 2966
nec_contract_type:
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - CECA Bulletins
  - Compensation events
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2024/02/GMH-CECA-NEC-Bulletin-Member-Briefing.jpg"
featured_image_alt: Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd
author: Glenn Hide
timestamp: 2024-12-30T12:42:43Z
tags:
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - CECA Bulletins
  - Compensation events
---

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC contracts that their members should take particular attention to.

The eight bulletin in our series is about the requirement or benefits of including a programme with a compensation event quotation, for which you can download a copy here:

[CECA NEC4 Bulletin No.8 – Programmes submitted with compensation event quotations – August 2021](https://gmhplanning.co.uk/wp-content/uploads/2021/07/CECA-NEC4-Bulletin-No.8-Programmes-submittted-with-compensation-event-quotations-August-2021.pdf)

The bulletins are intended to be a quick focus on certain aspects of the contract to allow parties to properly price and programme accordingly at tender stage and manage the contractual processes during the life of the project. This particular issue is something that Contractors can and should do more of and may help speed up the agreement of their compensation event quotations.

## Topics

**NEC Contract Editions:** [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [CECA Bulletins](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/ceca-bulletins.md), [Compensation events](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/compensation-events.md)