title: "NEC4 CECA Bulletin No 6: The importance of a regular Accepted Programme"
date: 2021-06-04T09:14:27Z
modified: 2024-12-30T12:42:44Z
permalink: "https://gmhplanning.co.uk/nec-downloads/nec4-importance-of-accepted-programme/"
type: downloads
status: publish
excerpt: ""
wpid: 2940
nec_contract_type:
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - CECA Bulletins
  - Programme
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2024/02/GMH-CECA-NEC-Bulletin-Member-Briefing.jpg"
featured_image_alt: Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd
author: Glenn Hide
timestamp: 2024-12-30T12:42:44Z
tags:
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - CECA Bulletins
  - Programme
---

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC contracts that their members should take particular attention to.

The sixth bulletin in our series is about the importance of a regular Accepted Programme, for which you can download a copy here:

[CECA NEC4 Bulletin No.6 – Important of Accepted Programme Every Period – June 2021](https://gmhplanning.co.uk/wp-content/uploads/2021/06/CECA-NEC4-Bulletin-No.6-Important-of-Accepted-Programme-Every-Period-June-2021.pdf)

The bulletins are intended to be a quick focus on certain aspects of the contract to allow parties to properly price and programme accordingly at tender stage and manage the contractual processes during the life of the project.

## Topics

**NEC Contract Editions:** [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [CECA Bulletins](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/ceca-bulletins.md), [Programme](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/programme.md)