---
title: "HIGHLIGHTS: NEC People Conference London 2025"
date: 2025-07-15T16:57:04Z
modified: 2025-07-15T19:48:49Z
permalink: "https://gmhplanning.co.uk/highlights-nec-people-conference-london-2025/"
type: post
status: publish
excerpt: ""
wpid: 8090
categories:
  - LinkedIn Group Conference
  - NEC People Conference
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2025/07/NEC-People-Conference-2025-London-Highlights-Reel.jpg"
featured_image_alt: NEC People Conference 2025 London Highlights Reel
author: GMH Admin
timestamp: 2025-07-15T19:48:49Z
tags:
  - LinkedIn Group Conference
  - NEC People Conference
---

#### NEC People Conference 2025 Highlights Reel

Really pleased to share the release of our highlights video from the [2025 NEC People Conference](https://gmhplanning.co.uk/nec-conferences/nec-people-conference-london-2025/) held in London in June. It gives a good insight and flavour of the day.

Do have a look at the NEC People Conference 2025 London [event videos](https://gmhplanning.co.uk/nec-conferences/nec-people-conference-london-2025/) for the full versions of each presentation.

[_how\_to\_reg_

Register for the next NEC People Conference](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/page/register-for-conference.md)

## Topics

**Categories:** [LinkedIn Group Conference](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/category/linkedin-conference.md), [NEC People Conference](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/category/nec-people-conference.md)