---
title: Works Information Guidance Document
date: 2013-05-04T09:26:25Z
modified: 2024-04-15T18:47:35Z
permalink: "https://gmhplanning.co.uk/works-information-guidance/"
type: post
status: publish
excerpt: ""
wpid: 712
categories:
  - NEC3 Contract
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2024/03/GMH-Planning-NEC-Training-NEC-Guidance-NEC-Consultancy-Hero-Image-2024.jpg"
featured_image_alt: GMH Planning Ltd - NEC Contract Experts. NEC Contract Training Courses & NEC Consultancy
author: Glenn Hide
timestamp: 2024-04-15T18:47:35Z
tags:
  - NEC3 Contract
---

I get asked quite a lot where people can get hold of the Engineering and Construction Contract
Works Information Guidance document which was produced and issued in 2012. It is an excellent guide which provides a more structured and thorough approach to putting together comprehensive Works Information which is obviously a big issue on many contracts.

This guide is available to download for free on the NEC website but for ease have also posted a copy here.

[Works Info Guidance](https://gmhplanning.co.uk/wp-content/uploads/2013/05/Works-Info-Guidance.pdf)[Download](https://gmhplanning.co.uk/wp-content/uploads/2013/05/Works-Info-Guidance.pdf)

## Topics

**Categories:** [NEC3 Contract](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/category/nec3-contract.md)