---
title: "Spirit of Mutual Trust and Co-operation: What does it really mean?"
date: 2026-05-28T06:48:43Z
modified: 2026-05-28T06:48:44Z
permalink: "https://gmhplanning.co.uk/spirit-of-mutual-trust-and-co-operation-what-does-it-really-mean/"
type: post
status: publish
excerpt: ""
wpid: 8643
categories:
  - NEC4 Contract
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2024/07/Trust.jpg"
author: Glenn Hide
timestamp: 2026-05-28T06:48:44Z
tags:
  - NEC4 Contract
---

Here is an interesting article written by Sean and Tim Leung about the meaning of “spirit of mutual trust and co-operation” to get a deeper understanding of it’s application.

I will also be jointly running a Webinar with Sean and Tim and Digital Beehive on the 19th June on this topic so watch out for registration links to watch it live or come back to the webinar section of the website from the 21st June to watch it back.

[What\_Does\_Mutual\_Trust\_Mean\_NEC4\_draft final (3)](https://gmhplanning.co.uk/wp-content/uploads/2026/05/What_Does_Mutual_Trust_Mean_NEC4_draft-final-3.pdf)[Download](https://gmhplanning.co.uk/wp-content/uploads/2026/05/What_Does_Mutual_Trust_Mean_NEC4_draft-final-3.pdf)

## Topics

**Categories:** [NEC4 Contract](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/category/nec4-contract.md)