---
title: NEC4 - Potential useful amendments
date: 2014-12-04T12:03:26Z
modified: 2024-04-15T22:58:07Z
permalink: "https://gmhplanning.co.uk/nec4-potential-useful-amendments/"
type: post
status: publish
excerpt: ""
wpid: 821
categories:
  - LinkedIn Group Conference
  - NEC3 Contract
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2022/01/NEC4-Engineering-and-Construction-Contract.jpg"
featured_image_alt: NEC4 Engineering and Construction Contract
author: Glenn Hide
timestamp: 2024-04-15T22:58:07Z
tags:
  - LinkedIn Group Conference
  - NEC3 Contract
---

Thought it was useful to reissue this document we produced back in 2011 to see what people thought of our list and if there is anything else that could be added to it. Let us know!!!

[LinkedIn NEC4 document – 2011](https://gmhplanning.co.uk/wp-content/uploads/2014/12/LinkedIn-NEC4-document-2011.pdf)[Download](https://gmhplanning.co.uk/wp-content/uploads/2014/12/LinkedIn-NEC4-document-2011.pdf)

## Topics

**Categories:** [LinkedIn Group Conference](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/category/linkedin-conference.md), [NEC3 Contract](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/category/nec3-contract.md)