title: Producing an NEC3 Programme
date: 2010-05-01T13:42:52Z
modified: 2024-03-01T09:49:37Z
permalink: "https://gmhplanning.co.uk/nec-downloads/producing-an-nec3-programme/"
type: downloads
status: publish
excerpt: ""
wpid: 1610
nec_contract_type:
  - NEC3
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - Programme
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2022/01/NEC3-and-NEC4-Downloads.png"
featured_image_alt: ECSS
author: Glenn Hide
timestamp: 2024-03-01T09:49:37Z
tags:
  - NEC3
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - Programme
---

A well thought out, detailed contractor’s programme should be used such that is a proactive management tool for both managing the works on a day-to-day basis, and a mechanism to demonstrate the effects and hence entitlement (if any) when change occurs. The NEC contract in terms of programme management is essentially a set of good practice project management requirements that, if followed, should beneﬁt all concerned.

This paper considers some of the practical problems in producing the first programme issued for acceptance, and offers some practical advice to both contractor and project manager to help to ensure that the up-to-date accepted programme that the contract is striving towards becomes the reality.

[MPL article – Producing an NEC3 programme](http://gmhplanning.co.uk/wp-content/uploads/2011/10/MPL-article-Producing-an-NEC3-programme.pdf)

## Topics

**NEC Contract Editions:** [NEC3](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec3.md), [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [Programme](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/programme.md)