title: "NEC4 CECA Bulletin No 13: Notifying early warnings and notifying compensation events"
date: 2022-01-06T08:45:05Z
modified: 2024-12-30T12:42:40Z
permalink: "https://gmhplanning.co.uk/nec-downloads/nec4-notifying-early-warning-compensation-event/"
type: downloads
status: publish
excerpt: ""
wpid: 4738
nec_contract_type:
  - NEC3
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
  - NEC Engineering & Construction Subcontract (ECS)
  - NEC Professional Services Contract (PSC)
download_category:
  - CECA Bulletins
  - Compensation events
  - Early warnings
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2024/02/GMH-CECA-NEC-Bulletin-Member-Briefing.jpg"
featured_image_alt: Cover image for CECA NEC4 Bulletin CECA Member Briefings by GMH Planning Ltd
author: Glenn Hide
timestamp: 2024-12-30T12:42:40Z
tags:
  - NEC3
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - NEC Engineering & Construction Subcontract (ECS)
  - NEC Professional Services Contract (PSC)
  - CECA Bulletins
  - Compensation events
  - Early warnings
---

GMH Planning in conjunction with CECA (Civil Engineering Contractors Association) are producing a series of monthly bulletins focusing each month on an aspect of NEC contracts that their members should take particular attention to.

The first bulletin in our 2022 series (13th overall) is about the subtle differences as to when an early warning should be notified, and when a compensation event should be notified.

The bulletin explores the different situations when either notification is applicable, and the importance of notifying the early warning or compensation event at the right time and the potential consequences that could arise if either party fails to do so.

This series of bulletins are intended to be a quick focus on certain aspects of the contract to allow parties to properly price and programme accordingly at tender stage and manage the contractual processes during the life of the project.

[CECA-NEC4-Bulletin-No.13-Notifying-early-warnings-and-notifying-compensation-events-January-2022](https://gmhplanning.co.uk/wp-content/uploads/2022/01/CECA-NEC4-Bulletin-No.13-Notifying-early-warnings-and-notifying-compensation-events-January-2022.pdf)

## Topics

**NEC Contract Editions:** [NEC3](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec3.md), [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md), [NEC Engineering & Construction Subcontract (ECS)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-subcontract.md), [NEC Professional Services Contract (PSC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-professional-services-contract-psc.md)

**Download Categories:** [CECA Bulletins](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/ceca-bulletins.md), [Compensation events](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/compensation-events.md), [Early warnings](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/early-warnings.md)