---
title: NEC4 ECC Contract Data
date: 2022-01-21T17:34:57Z
modified: 2024-08-20T20:29:20Z
permalink: "https://gmhplanning.co.uk/nec-downloads/nec4-ecc-contract-data-2/"
type: downloads
status: publish
excerpt: ""
wpid: 4872
nec_contract_type:
  - NEC4
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - Contract data
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2022/01/NEC4-Engineering-and-Construction-Contract.jpg"
featured_image_alt: NEC4 Engineering and Construction Contract
author: Glenn Hide
timestamp: 2024-08-20T20:29:20Z
tags:
  - NEC4
  - NEC Engineering & Construction Contract (ECC)
  - Contract data
---

Please find attached a downloadable and editable version of the NEC4 Engineering and Construction Contract (ECC) contract data that can be used in compiling your contracts. This was made available for free by Thomas Telford Ltd the authors of the contract. The NEC4 version of contract data is much more user-friendly and intended to be completed electronically.

If you require the equivalent contract data for any of the other NEC4 family of contracts please contact us direct and we will be happy to help.

[ECC Contract Data Editable](https://gmhplanning.co.uk/wp-content/uploads/2022/01/ECC-Contract-Data-Editable.docx)[Download](https://gmhplanning.co.uk/wp-content/uploads/2022/01/ECC-Contract-Data-Editable.docx)

## Topics

**NEC Contract Editions:** [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [Contract data](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/contract-data.md)