title: Get with the Programme...
date: 2012-02-20T20:33:58Z
modified: 2024-09-17T21:23:56Z
permalink: "https://gmhplanning.co.uk/nec-downloads/get-with-the-programme/"
type: downloads
status: publish
excerpt: ""
wpid: 1617
nec_contract_type:
  - NEC3
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - Programme
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2022/01/NEC3-and-NEC4-Downloads.png"
featured_image_alt: ECSS
author: Glenn Hide
timestamp: 2024-09-17T21:23:56Z
tags:
  - NEC3
  - NEC Engineering & Construction Contract (ECC)
  - Programme
---

[**Download**: Newsletter 57 – Get with the Programme](http://gmhplanning.co.uk/new-article-on-the-use-of-the-programme-within-nec3/newsletter-57-get-with-the-programme/)

Successful management of the [programme](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/guidance/ecc-clause-31-2-programme-requirements.md) under an NEC3 contract is so much more than just checking compliance with [clause 31.2](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/guidance/ecc-clause-31-2-programme-requirements.md). It is about attitude and management processes to ensure that the programme is fully utilised by the project team. The requirements of the contract should become second nature to the Contractor and something they should be doing for themselves. This article explores this in more detail.

We offer several NEC Training Workshops on [management of the NEC Programme.](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/training/nec-training-course-nec3-nec4-programme-workshop.md)

## Topics

**NEC Contract Editions:** [NEC3](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec3.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [Programme](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/programme.md)