title: Contract Data and Schedule of Cost Components Survey
date: 2014-07-17T06:45:18Z
modified: 2024-03-01T09:49:25Z
permalink: "https://gmhplanning.co.uk/nec-downloads/contract-data-schedule-cost-components-survey/"
type: downloads
status: publish
excerpt: Survey results from questions on NEC3 ECC schedule of cost components and contract Data.
wpid: 813
nec_contract_type:
  - NEC3
nec_contract_version:
  - NEC Engineering & Construction Contract (ECC)
download_category:
  - Contract data
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2022/01/NEC3-and-NEC4-Downloads.png"
featured_image_alt: ECSS
author: Glenn Hide
timestamp: 2024-03-01T09:49:25Z
tags:
  - NEC3
  - NEC Engineering & Construction Contract (ECC)
  - Contract data
---

Matthew Garratt shared with us some interesting questions at the recent BuiltIntelligence NEC People conference around the use and understanding of aspects of the Contract Data and Schedule of Cost Components. Here are the initial survey results from all those in the group and demonstrates some interesting trends and food for thought for the drafters of subsequent revisions of the contract.

[Audience Feedback Survey – ECC Contract Data – Why Are Users Getting It Wrong](http://gmhplanning.co.uk/wp-content/uploads/2014/07/Audience-Feedback-Survey-ECC-Contract-Data-Why-Are-Users-Getting-It-Wrong.pdf)

## Topics

**NEC Contract Editions:** [NEC3](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec3.md)

**NEC Contract Versions:** [NEC Engineering & Construction Contract (ECC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-construction-contract-ecc.md)

**Download Categories:** [Contract data](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/contract-data.md)