---
title: NEC4 ECSC Contract Data
date: 2022-01-21T17:43:36Z
modified: 2024-08-20T20:29:19Z
permalink: "https://gmhplanning.co.uk/nec-downloads/contract-data-for-nec4-ecsc-contract-old/"
type: downloads
status: publish
excerpt: ""
wpid: 4874
nec_contract_type:
  - NEC4
nec_contract_version:
  - NEC Engineering and Construction Short Contract (ECSC)
download_category:
  - Contract data
featured_image: "https://gmhplanning.co.uk/wp-content/uploads/2017/08/NEC4-Engineering-and-Construction-Contract-Short-Contract-ECSC-e1649098238321.jpg"
featured_image_alt: NEC4 Engineering and Construction Contract Short Contract ECSC
author: Glenn Hide
timestamp: 2024-08-20T20:29:19Z
tags:
  - NEC4
  - NEC Engineering and Construction Short Contract (ECSC)
  - Contract data
---

Please find attached a downloadable and editable version of the NEC4 Engineering and Construction Short Contract (ECSC) contract data that can be used in compiling your contracts. This was made available for free by Thomas Telford Ltd the authors of the contract. The NEC4 version of contract data is much more user-friendly and intended to be completed electronically.

If you require the equivalent contract data for any of the other NEC4 family of contracts please contact us direct and we will be happy to help.

[ECSC Contract Data Editable](https://gmhplanning.co.uk/wp-content/uploads/2022/02/ECSC-Contract-Data-Editable.docx)[Download](https://gmhplanning.co.uk/wp-content/uploads/2022/02/ECSC-Contract-Data-Editable.docx)

## Topics

**NEC Contract Editions:** [NEC4](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_type/nec4.md)

**NEC Contract Versions:** [NEC Engineering and Construction Short Contract (ECSC)](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/nec_contract_version/nec-engineering-and-construction-short-contract-ecsc.md)

**Download Categories:** [Contract data](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/taxonomy/download_category/contract-data.md)