---
title: NEC People Conference
type: taxonomy_archive
taxonomy: category
slug: nec-people-conference
term_id: 48
permalink: "https://gmhplanning.co.uk/category/nec-people-conference/"
post_count: 6
---

# NEC People Conference

Posts in this archive: 6

- [HIGHLIGHTS: NEC People Conference Scotland 2025](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/post/highlights-nec-people-conference-scotland-2025.md)
- [HIGHLIGHTS: NEC People Conference London 2025](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/post/highlights-nec-people-conference-london-2025.md)
- [HIGHLIGHTS REEL: NEC People Conference 2024 London](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/post/highlights-reel-nec-people-conference-2024-london.md) — Really pleased to share the release of our highlights video from this years NEC People Conference held in London on the 18th June 2024. It gives a good insight and flavour of the day. We already have our Northern Conference advertised for Leeds on the
- [SURVEY: State of the Industry - NEC Contracts](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/post/state-of-the-industry-survey-nec-contracts.md)
- [VIDEO: NEC People Conference Videos 2017](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/post/nec-people-conference-videos-2017.md)
- [How to REALLY get compensation events implemented](https://gmhplanning.co.uk/wp-content/uploads/wp-mfa-exports/post/how-to-really-get-compensation-events-implemented.md) — A guide to “how to really get Compensation Events Implemented” - ideas and solutions from 60 or so people.
